Package Quicklinks:
Questions? Fill out the form or call/text/WhatsApp Kameron Anderson @ 403-819-3906
Questions? Fill out the form or call/text/WhatsApp Kameron Anderson @ 403-819-3906
Presently sitting 5’ off the ground, in Crossfield, amongst the mass of tanks seen from the west side of Hwy 2, is this beauty. A 10 Well header package with a 30” separator: dual 10” group lines; Cameron valves; full sour. It’s simple and is a premium build-out. If it fits your application, buy it! Once you know the price, you’ll know why I say that. Nexen awarded this job to a PO amount of around $600,000. After the project was canceled 4 years later, it was purchased from Nexen at a blowout price and is now owned by a wholesaler. Price on this? Well, thanks for asking – a mere 15% of the original PO cost! Or $95,000. Check out the next few pages to see the details and be sure to grab the drawings off of our website if it’s not already attached to this document.
If you’re a broker and you want to present this to your client, call us to get a customized unbranded feature sheet so you can add in your notes and price.
Download a Crusader branded feature sheet or for brokers, an unbranded feature sheet for you to share with your customer network.
Drawings will be available shortly. Contact us for requests.
Click on the “Additional information” tab above to see at a glance details for this package.
Condition | New / Never Used |
---|---|
Manufactured | Manufactured by Bromley, 2014 – Full “As Built” Drawings & QA |
Location | Calgary, AB |
Registration | AB/BC |
Status / Availability | Disconnected, Ships Immediately |
Service | Sour Service |
Piping Connections | Complete package is rated for 600# |
Shipping Dimensions | 12’3” W x 50’ L x 15’ H; 80,000lbs |
Building Notes | Instrumentation, gaskets, heaters, exhaust fans as per PID are in the crates. Highlights: Jupiter JM4 level transmitter w/ Magentrol Orion Atlas magnetic level, Rosemount PIT’s, Rosemount TT’s, , 2 x 2 turbine flow meter. Electrical, instrumentation install and tubing, as well as the meter runs are additional cost to you. First class and neutral colored building, Insulated Skid with lifting lugs. |