Crusader went out to our customer’s site recently to see these two operational used 2013 (YOM) Titan 130 15MW (ISO) 60Hz 13.8kV natural gas units, both located in Alberta Canada. The two Titan gas turbine generator sets are on the Solar InSights program, with Solar’s high engagement/maintenance/service with the operators.

Both are excellently taken care of. Other than the buildings, they are essentially identical turbine generator packages consisting of a main turbine building (with sound attenuated compact GTG enclosure inside), plus MCC/switchgear building, an instrument air building, and a transformer outside. One of the two T130’s was run a couple of days ago from our visit, and the other Titan 130 was up and running when we visited.

You can view the full listing of the two units below:

Two (2) Used Solar Titan T130 60Hz Natural Gas Turbine Generator Packages – CJV-U570

We have lots of additional technical documentation available upon request and we more information coming soon for each Solar Titan 130 package – with individual turbine listings. Additionally we have partners who are preparing removal estimates for these two packages.

Looking for surplus turbine generation solutions? Reach out to Crusader, we’d love to learn about your project and explore how we might assist you.

Please don’t hesitate to reach out to us if you’d like to discuss, if you’re looking for a different genset solution or you’re looking for other used oil and gas or oilfield equipment for sale.


Full Video Transcript

[START OF VIDEO – 0:00]

I’m up to my knees in snow to show how far we’ll go to show you this: Solar Titan T130 solar natural gas turbine generator packages. We’ve been out touring them today; there’s two of them close by to each other, 13.8 KV. We’ve got the entire system here – got the air inlet, the air outlet, transformers, electrical switch gear buildings, air compressor buildings. Best of all, this can get going immediately. We’ve got the partners out here today looking at what it would take to decommission and remobilize the two used Titan T130 gensets into your power project. In a world where available stock / surplus turbines are becoming slimmer and slimmer to find by the day, these two, within 20 minutes of each other, can get remobilized immediately. Let’s get it happening.

[END OF VIDEO – 0:55]