A total of 1800m3/day of flow, immediate delivery, and half the price. Get a peek of a MILLION dollars of value, without the drama of building new

It’s a never-used fully sour never-used 300HP water injection/disposal & sales-oil pump package that’s ready to go for demanding projects – and conveniently stored at our friends PACE Transportation Plus in Nisku, AB.

Watch as Kameron showcases the perks of this exceptional package. Connect with us to learn more about this high-value pump, available at a surplus-level discount.

Listing: New / Never-used 300 HP Water Injection / Disposal Pump Package CJV-U496

Surplus Water Injection / Water Disposal / Sales Oil Pump Package Highlights:

  • Two (2) FMC M18 Pumps
  • Two (2) 150HP TECO Westinghouse Electric Motors
  • Two (2) 3 x 1.5-13 Sundyne Charge Pumps
  • Two (2) 10HP Teco Westinghouse Electric Motors
  • Two (2) Three Bag FiltersTwo (2) Suction Stabilizers
  • Two (2) Discharge Stabilizers
  • Suction Pressure: 150#
  • Discharge Pressure: 600#
  • Sour Service
  • Immediately available

Please don’t hesitate to reach out to us if you’d like to discuss, if you’re looking for a different pump solution or you’re looking for other used oil and gas or oilfield equipment for sale.


Full Video Transcript

0:00
in this episode of million dollar listing
0:02
Becky said what don’t they have any
0:04
respect for my position this is both no
0:07
I’m done this is this this is this is outrageous!
0:13
well that was a little melodramatic
0:15
don’t you think but I am excited to show
0:17
you this a dual 150 horsepower sales oil
0:21
water injection package now this was an
0:24
Engineers dream in 2014 the original
0:27
purchase order was $740,000
0:30
in today’s value in Market easily worth
0:33
a million dollar let me point out a few
0:35
reasons why first of all let’s start off
0:37
with the Sundyne pumps two 10 horsepower
0:40
full stainless steel centrifugal pumps
0:42
boosting into two three bag filters full
0:46
stainless steel again all the piping is
0:49
full sour heat treated we’ve got a sour
0:52
uh sealed sump with a truck out pum here
0:55
since we’re standing here let’s talk
0:56
about the electrical and instrumentation
0:58
we’ve got all sorts of electrical in
1:00
here H2S LEL interior lights exterior
1:03
lights ESD buttons recepticles handoff
1:06
Autos all wired to junction boxes up top
1:10
here we’ve got two 150 horsepower motors
1:13
driving this the stars of the show The
1:16
FMC M18 Triplex pump full stainless
1:20
steel fluid ends the fluid ends are
1:22
pumping into a 600 ANSI system but they
1:24
will handle upwards of 3,000 PSI so even
1:27
if you want to change out the piping to
1:28
a higher discharge pressure you can
1:30
still do that and be way further ahead
1:32
than building new now in real estate
1:34
it’s all location location location but
1:37
we took care of that because we called
1:40
this from basically the Northwest
1:42
Territories where this was unit was
1:44
supposed to be started up at one point
1:45
so now we’re talking about availability
1:48
availability availability this thing
1:50
would take 25 weeks to build today but
1:52
you can have it literally today we have
1:54
all the QC information there is
1:56
drawings out the wazoo on this thing point
1:59
is take it home today less than $500,000
2:02
reach out to
2:06
[Music]
2:07
us